

© Copyright 1995 thru 2008 - The Mustang Works™. All Rights Reserved.
MustangWorks.com is designed and hosted by Aero3 Media.
MustangWorks.com is designed and hosted by Aero3 Media.
|
![]() |
#1 |
Registered Member
Join Date: Feb 2000
Location: INDIANA
Posts: 658
|
![]() I was wondering because i need to do mine they haven't been welded yet
------------------ 86GT-MACcatback-89heads,intake,TB,KENNYBROWNsubs,3.73's,HURST shifter,much more to come |
![]() |
![]() |
![]() |
#2 |
Registered Member
Join Date: Jan 1999
Location: Clayton, North Carolina, USA
Posts: 803
|
![]() If you look at the torque box you will see a seam where the sheet metal is spot welded together. Weld that entire seam, you will need to remove the control arms. Wild Rides sells a kit that will improve the strength of the torque box. I think it is a cheap investment as long as you are in there welding it up anyway.
------------------ fordgasm CLICK HERE to see my 87 GT |
![]() |
![]() |
![]() |
#3 | |
Registered Member
Join Date: Oct 2000
Location: Ontario, Canada
Posts: 234
|
![]() Quote:
[This message has been edited by shovelnose (edited 01-03-2001).] |
|
![]() |
![]() |
![]() |
|
|