© Copyright 1995 thru 2008 - The Mustang Works™. All Rights Reserved.
MustangWorks.com is designed and hosted by Aero3 Media.
MustangWorks.com is designed and hosted by Aero3 Media.
12-06-2003, 07:16 PM | #1 |
Registered Member
Join Date: Oct 2003
Location: Chicago
Posts: 1
|
Winter project
Fabarication of my IRS is complete. My brakes are in also. I'll be installing the IRS, along with 15" rotors, during the winter. I'll keep a picture diary to share.
|
|
|
Similar Threads | ||||
Thread | Thread Starter | Forum | Replies | Last Post |
project names! | my9250GT | Blue Oval Lounge | 10 | 06-23-2003 11:56 PM |
Is this a project I could handle?!? (Intake, heads, cam...) | Sonics2042 | Windsor Power | 4 | 03-19-2002 06:47 PM |
Now that it's almost winter... | Capri306 | Blue Oval Lounge | 23 | 11-24-2001 12:28 PM |
!@#$%^&*() stole my winter beater!!! | SisuStang | Blue Oval Lounge | 4 | 03-15-2001 01:47 PM |