It is a full 1/4 mile, less than 45 minutes(less than 30 how i drive

) from OC, not sure on elevation though...shouldn't be too different from pomona though....
------------------
90 Honda CRX aka
Project Mongoose
Estimated Completion: ON STANDBY
84 Toyota Supra:
Japanese 6mge installed within two weeks.....
High flow cat, two chamber flowmaster, custom 2.5" piping, msd 8.5mm wires. Will have boost before 2002.
Have HKS turbo manifold for it

.....