A buddy here at work said it took almost 10 minutes to get some of his new lifters to pump up when he did his Jeep.
I've had mine started quite a few times but have not run it that long.
Is this common for new lifters? Could this be my noise???
__________________
Spec Service (UHP), BFG G-Force KDW's, Turbo Coupe 3.55 rear w/disks, 73mm calipers, Stg 1 Twisted Wedges, TFS Street Intake, 70mm TB, E cam, Crane 1.7's, Aeromotive FPR, BBK 1 5/8 shorties, elec fan, FMS Al Radiator, Moroso Wires, Kenne Bell Ramair, March pulleys, Race Magnums, 190 lph Walbro, FMS Al Dshaft, D/S loop, MM 4point rollbar, FMS C spngs, strut tower brace, Tokico Illuminas, Prothane bushings, MM Lwr Conrol Arms, KB welded subs, Cervini Mach 1 hood/valence/side skirts/wing/airdam.
|