View Single Post
Old 04-02-2006, 07:18 AM   #25
andy669
Registered Member
 
andy669's Avatar
 
Join Date: Jan 2001
Location: Moline Il
Posts: 901
Default Re: zero decking the block

3 thou off the top of the piston is going to make the engine more reliable?

We have a fixture for our lathe that is specifically for this. It takes about 15-20 minutes per piston. I think the most i've ever taken off a set is .020.

Andy
__________________
88 coupe

91 LX NMRA Pure Street 5120
andy669 is offline   Reply With Quote