ZEX is the easiest complete kit to install by far. It takes about 3 hours from start to finish. This included the time that it took me to find a "hidden" spot for it
__________________
STEEDA U/D PULLIES, MEZEIRE ELECTRIC H20 PUMP, DIABLOSPORT PREDATOR FLASH TUNER, BASSANI MID LENGTH HEADERS AND CATTED X, FLOWMASTERS W/ TURN DOWNS, C&L UPPER INTAKE, 80mm MASS AIR METER,AND TRUE FLOW PIPE, 75 mm BBK TB125 ZEX, 24lb INJECTORS, 4.10s, B&M HAMMER, EIBACH PROGRESSIVE, COBRA WHEELS 275x45R17(F), 315x40r17(R), KENNY BROWN SUBFRAMES, BBK STRUT TOWER BRACE, V6 SLEEPER BUMPER/ SHAVED EMBLEMS
|