

© Copyright 1995 thru 2008 - The Mustang Works™. All Rights Reserved.
MustangWorks.com is designed and hosted by Aero3 Media.
MustangWorks.com is designed and hosted by Aero3 Media.
|
![]() |
#1 |
Registered Member
Join Date: May 2001
Location: Yuma, AZ
Posts: 536
|
![]() Hell yes it does!!! Between the little parts that you run to the store to get, the parts that you discover need replacing half way through the project, and all the other miscellaneous murphy's law things that happen, it takes longer and costs more for me every time.
For example, this weekend I plan on replacing the top end of my motor. Heads, intake, injectors, TB/EGR, cam, FPR, etc. I figure it will take me the entire weekend (including Monday because I have that day off) if I take my time and make sure it's done correctly. Therefore it will probably ACTUALLY be finished in about two weeks. After I get it running, then work all the kinks and tuning issues. You'll probably be seeing a thread in the Windsor Forum about something or another. Dave |
![]() |
![]() |
![]() |
Thread Tools | |
Display Modes | Rate This Thread |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
project names! | my9250GT | Blue Oval Lounge | 10 | 06-23-2003 11:56 PM |
2002. It Was A Pretty Decent Year | PKRWUD | Blue Oval Lounge | 21 | 01-07-2003 11:45 PM |
Newspaper Headlines in the Year 2035 | MustangKelly96 | Blue Oval Lounge | 5 | 10-10-2002 11:20 PM |
Project 5.4L! (long) | Mustang92 | Modular Madness | 14 | 12-19-2001 04:47 PM |
Last year of Functional Side Scoops? | 95mustanggt | Blue Oval Lounge | 2 | 08-30-2001 05:37 PM |