

© Copyright 1995 thru 2008 - The Mustang Works™. All Rights Reserved.
MustangWorks.com is designed and hosted by Aero3 Media.
MustangWorks.com is designed and hosted by Aero3 Media.
|
![]() |
#1 |
Dirk Diggler
Join Date: Feb 1999
Location: SLOATSBURG, NY
Posts: 1,931
|
![]() if you dont want any problems then do it like this
run 1/0 GA welding cable from the battery to the starter soiloniod..run 4 gauge welding cable from the Alternator to the starter soilniod also(only if your running a 3G alt) it might be a wise deseicion to run a dedticated 4 gauge wire up to the front for the computer and sensor grounds besides running a piece of 1/0 GA to the floor by the battery..that way there will be ground interferance and the computer will run perfect.. i havent had problem without running a seperate ground upfront but i have heard some people do have problems with compters without doing this..
__________________
95 undecided cubes, AFR 185s,undecided cam, undecided intake, and a 150 hit 89 "turbonotch" 2.3T You might want to hold on..i saw this on a cartoon once |
![]() |
![]() |
![]() |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
Battery relocation. Any bad effects? | Dark_5.0 | Windsor Power | 5 | 01-11-2004 09:06 AM |
Battery Relocation - parts question | Stang951 | Windsor Power | 2 | 07-20-2002 08:51 PM |
Battery Relocation - parts question | Stang951 | Audio, Security, & Electronics | 0 | 07-20-2002 08:18 PM |
NHRA Battery relocation rules | Stang_ROTY | Windsor Power | 3 | 06-25-2002 03:55 PM |
Battery Relocation... | Bad89stang | Windsor Power | 1 | 12-01-2001 12:47 PM |