
© Copyright 1995 thru 2008 - The Mustang Works™. All Rights Reserved.
MustangWorks.com is designed and hosted by Aero3 Media.
MustangWorks.com is designed and hosted by Aero3 Media.
|
|
#1 |
|
Registered Member
Join Date: Apr 2003
Posts: 7
|
hi i have a 67 mustang fastback and the front frame rail supports are rusted and need to be replaced......how hard are those to weld? is there any kinda precautions i should know about???...and does anyone know about how much that would cost to have done???....
|
|
|
|
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| sub frame connectors | 84GT350-1 | Windsor Power | 9 | 05-31-2004 10:07 AM |
| Sub frame connectors, roll cage ????? | 84GT350-1 | Windsor Power | 3 | 05-11-2004 09:59 AM |
| Sub frame connector recommendation? | 92LimEd | Windsor Power | 3 | 10-18-2002 09:19 PM |
| Launch.....hitting frame tunnel! HELP!! | Extremestang | Windsor Power | 4 | 08-14-2002 08:44 PM |
| Frame supports for an '85? | strawberryfield | Small Ponies | 0 | 01-01-2002 01:21 PM |
